News
Several attractive prospects have been identified in the license, with the Pil-prospect high-graded as the first to be drilled late 2013 or early 2014.
Several attractive prospects have been identified in the license, with the Pil-prospect high-graded as the first to be drilled late 2013 or early 2014.